FlowSuite

Common messages in FlowTime and what to do

Published on 28. November 2026

FlowTime shows short notices when something does not fit. Here are the most common messages by situation, each with a solution.

When starting and stopping

Please select a project before stopping the time tracking. In project mode every entry needs a project. Pick one under Select project and stop again.

Please enter a description before stopping the time tracking. Briefly enter what you worked on in the What are you working on? field.

A time tracking session is already running. Please stop or cancel it first. Only one timer runs per person, across teams and the FlowTime app too. The top bar of the app shows it. Stop it and then start the new one.

Your running entry belongs to a different team. You started the timer in another team. Switch to that team and stop it there.

This entry overlaps with an existing entry. Only a notice. The timer starts or the entry is saved anyway. Check afterwards whether two times are duplicated.

You are already clocked in. or You are not clocked in. The time clock was used in a second tab, on another device or in the app. Reload the page.

When editing and adding entries

Please enter the time in HH:MM format. Times with two digits each for hours and minutes, for example 08:30.

The date cannot be in the future. (also for start and end date) Times are only possible for today and past days.

The start time cannot be after the end time. and The end time cannot be before the start time. If the work ended the next day, also change the end date.

No permission for the selected project. or The selected project is invalid. The project is private and you have no access, or it does not belong to your current team. Ask for access or choose another project.

Messages about the time clock are explained in Correct clock times or add a missing workday.

With absences

You already have an absence in this period. Please choose a different period. Two absences must not overlap. Cancel the old one or choose other days.

The request exceeds your remaining entitlement. You do not have enough vacation days left. Talk to your team lead.

You can report retrospectively up to 30 days into the past. Older sick days or business trips are entered by the owner.

More in Request and report absences.

When something changed in the background

The time tracking mode has changed. Please reload the page. The owner switched between time clock and project mode. Reload the page.

The status has changed. Please reload the page. You used the time clock elsewhere, for example in the app. After reloading everything is correct.

When opening FlowTime or single pages

You have not been granted this module. Please contact your team owner. You have no access to FlowTime. The owner grants it in FlowSuite under Team, see Who can do what in FlowTime?. Other causes are listed in No access to FlowSuite or a module.

This module is deactivated for your team. FlowTime is switched off for the whole team. Only the owner can switch it back on, see Switch modules on and off for the whole team.

This module is not part of your team's package. or This module is locked: your team's trial expired on … The booked package does not cover FlowTime, or the trial is over. Packages and prices are shown under Billing.

Access to this feature denied. You opened a page such as Reports, Team Report, Projects, Logs or Shift plan without the matching sub-right.

The shift system is not enabled for this team. Shift planning is switched off. The owner switches it on under Settings on the Shift system card.

Overtime is not enabled for this team. or Overtime is not tracked for you. Either the team has overtime switched off, or Track overtime is off for you. The owner changes both, see Understand the Overtime page.

Projects are only available in project mode Your team uses the time clock. The project data is kept, see Simple time tracking or project mode.

Was this article helpful?

Back to FlowTime