Before you build a shift plan, you define which shifts exist. FlowTime has two levels for this: the shift type describes the work, for example phone duty. The template describes a concrete shift of that type with times, staffing and weekdays, for example the early shift from 6 am to 2 pm.
Before you start
The shift system is switched on, see FlowTime settings at a glance. Shift types is visible to the owner, members with full access to FlowTime and members with the Schichtplanung (shift planning) sub-right.
Creating a shift type
- In the Shift plan section, open Shift types.
- Click New shift type.
- Enter a Name, for example Phone duty.
- Give it a Short name of up to ten characters, for example TEL. It is saved in capital letters.
- Choose a Color. It helps in the plan and in the legend.
- Add a Description if you like.
- Leave Active on and click Save.

Creating templates
- Click the shift type on the left. Its Templates appear on the right.
- Click New template.
- Enter a Name, for example Early shift.
- Enter Start time and End time. If the end time is earlier than the start time, the shift runs past midnight, for example 22:00 to 06:00.
- Set the Min. staffing, at least 1.
- Set the Max. staffing if needed. Empty means Unlimited.
- Choose the Default days on which the shift normally takes place.
- Leave Active on and click Save.

The default days matter: with Create from templates, FlowTime creates a shift from the template on exactly these days.
Editing, deactivating, deleting
- Editing a shift type: the pencil next to it.
- Editing or deleting a template: directly on the template. Before deleting, FlowTime asks Really delete this template? and points out that this cannot be undone.
- No longer using a shift type: there is no delete button for shift types. Switch it off with Active; it is then marked Inactive.
Existing plans are not affected by changes to templates. A template only applies to plans you create afterwards.
Why is a template missing from a new plan?
- The template or its shift type is not Active.
- The weekday is not among the Default days.
- The week already had shifts. Create from templates only fills an empty plan, so it does not add to a week created with Copy from last week, for example.
Continue with Plan shifts for your team and Edit the shift plan and assign staff.