FlowSuite

How time rounding works in FlowTime

Published on 28. November 2026

Many agencies bill in quarter or half hours. That is what time rounding is for. It applies to reports, exports and the hours budget, while the tracked times themselves stay unchanged. Rounding only exists in project mode.

How rounding works

FlowTime rounds each entry up to the interval, never down. With 15 minutes that means:

  • 7 minutes become 15 minutes.
  • 15 minutes stay 15 minutes.
  • 16 minutes become 30 minutes.
  • 1 hour and 2 minutes become 1 hour and 15 minutes.

Rounding happens per entry, not per day. Three phone calls of 5 minutes each add up to 45 minutes in the report with 15-minute rounding.

Setting the rounding

  1. In the FlowTime sidebar, open Settings.
  2. In the Team settings, choose the interval on the Time rounding card, for example 15 minutes.
  3. Click Save FlowTime.

You can choose No rounding, Full minutes, 5, 10, 15, 20, 30, 45 minutes and 60 minutes (1 hour). Only the owner and co-owners can change it.

Why is time rounding greyed out?

Your team uses Simple time tracking. The page then shows In simple time tracking mode, times are always shown exactly; time rounding does not apply.

Rounding in the reports

Once an interval is set, Reports shows the switch Use team rounding in both Overview and Detailed, with the interval next to it, for example Team setting: 15 minutes. It is switched on when you open the report. Switch it off to see the exact times. The same switch exists in the annual statistics of a FlowCRM project.

The report with the Use team rounding switch on and the note about 15 minutes

A PDF with rounded times for your client

  1. Under Reports > Detailed, click PDF export.
  2. Choose what the PDF should contain:
    • Show amounts: hourly rates and amounts appear in the PDF. You only see this option if you are allowed to see costs and amounts.
    • Round duration: the duration of each entry is rounded up to the interval.
    • Round times: the clock times also match the rounded duration. The start time stays and the end time is recalculated (End time = start + rounded duration). This option only works together with Round duration.
  3. Click Export.

The PDF export window with the switches Show amounts, Round duration and Round times

Without Round times, the PDF shows the real clock times next to the rounded duration, such as 09:00 to 09:07 next to 0.25 hours. For client reports you will usually want both options on.

Good to know

  • Your entries in the Tracker stay accurate to the second. If you switch rounding off, all reports match the real times again straight away.
  • A project's hours budget counts rounded hours as soon as rounding is set. See Set and monitor a project budget.
  • How to filter and export reports in general is described in Create and export time reports.

Was this article helpful?

Back to FlowTime