How many hours did your team spend calling in the project this week? And is someone clicking through outcomes without actually calling? The Admin dashboard of a project answers both with its Project timer and Rapid clicking sections.
Who sees the admin dashboard
You find the Admin dashboard menu item under the project in the sidebar if your role has the Discrepancies right. In the standard roles, that is Inhaber and Admin. At the top you switch between Project timer and Rapid clicking.
The project timer
Every project has an automatic, invisible timer. Nobody has to start or stop it.
- It starts as soon as someone actively works in the project: records a call outcome, saves a comment, saves form data, sends an email to a lead or opens the Add lead page.
- It stops when no such action happens for five minutes. The next action starts a new time block.
Just looking at a lead doesn't count.

The page shows:
- Total and below it the hours per calendar week.
- A table per day with Day, Entries, First entry, Last entry and Tracked.
- Time tracked per agent and day: the same details per person.
- At the bottom, the individual time blocks with Start, Stop, Agent and Minutes.
The hours per week also appear on the FlowCall Dashboard in a project's Preview. Compare them with the Volume you entered under Start / End in the project overview to see how much of the planned hours have been used.
Rapid clicking
Here FlowCall lists entries where the same person recorded two call outcomes less than 15 seconds apart. That can be a sign that leads were ticked off without calling. It can also have harmless reasons, for example when someone enters several outcomes in a row from a paper call list.
The table shows, for each entry, the Lead, when it was Recorded, the Caller, Name and Status.

Talk to your team about conspicuous cases before drawing conclusions.
Good to know
- No link to FlowTime: the project timer is a FlowCall evaluation only. It doesn't create time entries in FlowTime. If you want to bill working time, record it there, for example directly in the project, see Time tracking directly in a FlowCRM project.
- Longer breaks don't count: if more than five minutes pass between two actions, the block ends.
- Invisible to the team: callers don't see the timer.